§ 904.6 — Charge For Capacity And Firm Energy
10 C.F.R. § 904.6
View:
The charge for Capacity and Firm Energy from the Project shall be composed of two separate charges; a charge to provide for the basic revenue requirements, as identified in paragraphs (b), (c), and (d) of § 904.5 of these General Regulations (Base Charge), and a charge to provide the surplus revenue for the Lower Colorado River Basin Development Fund contribution, as identified in paragraph (e) of § 904.5 of these General Regulations (Lower Basin Development Fund Contribution Charge).
Authorizing Statute
-
Congressional declaration of purpose and policy43 U.S.C. § 1501
-
Definitions42 U.S.C. § 7101
-
Promulgation of charges for electrical energy43 U.S.C. § 618