Code of Federal Regulations · Subpart
Subpart D — Ventilation
30 C.F.R. pt. 75, subpt. D
- § 75.300 Scope
- § 75.301 Definitions
- § 75.302 Main Mine Fans
- § 75.310 Installation Of Main Mine Fans
- § 75.311 Main Mine Fan Operation
- § 75.312 Main Mine Fan Examinations And Records
- § 75.313 Main Mine Fan Stoppage With Persons Underground
- § 75.320 Air Quality Detectors And Measurement Devices
- § 75.321 Air Quality
- § 75.322 Harmful Quantities Of Noxious Gases
- § 75.323 Actions For Excessive Methane
- § 75.324 Intentional Changes In The Ventilation System
- § 75.325 Air Quantity
- § 75.326 Mean Entry Air Velocity
- § 75.327 Air Courses And Trolley Haulage Systems
- § 75.330 Face Ventilation Control Devices
- § 75.331 Auxiliary Fans And Tubing
- § 75.332 Working Sections And Working Places
- § 75.333 Ventilation Controls
- § 75.334 Worked-out Areas And Areas Where Pillars Are Being Recovered
- § 75.335 Seal Strengths, Design Applications, And Installation
- § 75.336 Sampling And Monitoring Requirements
- § 75.337 Construction And Repair Of Seals
- § 75.338 Training
- § 75.339 Seals Records
- § 75.340 Underground Electrical Installations
- § 75.341 Direct-fired Intake Air Heaters
- § 75.342 Methane Monitors
- § 75.343 Underground Shops
- § 75.344 Compressors
- § 75.350 Belt Air Course Ventilation
- § 75.351 Atmospheric Monitoring Systems
- § 75.352 Actions In Response To Ams Malfunction, Alert, Or Alarm Signals
- § 75.360 Preshift Examination At Fixed Intervals
- § 75.361 Supplemental Examination
- § 75.362 On-shift Examination
- § 75.363 Hazardous Conditions And Violations Of Mandatory Health Or Safety Standards; Posting, Correcting, And Recording
- § 75.364 Weekly Examination
- § 75.370 Mine Ventilation Plan; Submission And Approval
- § 75.371 Mine Ventilation Plan; Contents
- § 75.372 Mine Ventilation Map
- § 75.373 Reopening Mines
- § 75.380 Escapeways; Bituminous And Lignite Mines
- § 75.381 Escapeways; Anthracite Mines
- § 75.382 Mechanical Escape Facilities
- § 75.384 Longwall And Shortwall Travelways
- § 75.385 Opening New Mines
- § 75.386 Final Mining Of Pillars
- § 75.388 Boreholes In Advance Of Mining
- § 75.389 Mining Into Inaccessible Areas