Code of Federal Regulations · Subpart
Subpart G — Facility Design, Fabrication, And Installation
30 C.F.R. pt. 285, subpt. G
- § 285.700 What Reports Must I Submit To Bsee Before Installing Facilities Described In My Approved Sap, Cop, Or Gap?
- § 285.701 What Must I Include In My Facility Design Report?
- § 285.702 What Must I Include In My Fabrication And Installation Report?
- § 285.703 What Reports Must I Submit For Project Modifications And Repairs?
- § 285.704 After Receiving The Fdr, Fir, Or Project Verification Reports, What Will Bsee Do?
- § 285.705 When Must I Use A Certified Verification Agent (cva)?
- § 285.706 How Do I Nominate A Cva For Bsee Approval?
- § 285.707 What Are The Cva's Primary Duties For Facility Design Review?
- § 285.708 What Are The Cva's Or Project Engineer's Primary Duties For Fabrication And Installation Review?
- § 285.709 When Conducting Onsite Fabrication Inspections, What Must The Cva Or Project Engineer Verify?
- § 285.710 When Conducting Onsite Installation Inspections, What Must The Cva Or Project Engineer Do?
- § 285.711 [reserved]
- § 285.712 What Are The Cva's Or Project Engineer's Reporting Requirements?
- § 285.713 [reserved]
- § 285.714 What Records Relating To Fdrs, Firs, And Project Modification And Repair Reports Must I Keep?