Code of Federal Regulations · Part
Part 816 — Permanent Program Performance Standards—surface Mining Activities
30 C.F.R. pt. 816
- § 816.1 Scope
- § 816.2 Objectives
- § 816.10 Information Collection
- § 816.11 Signs And Markers
- § 816.13 Casing And Sealing Of Drilled Holes: General Requirements
- § 816.14 Casing And Sealing Of Drilled Holes: Temporary
- § 816.15 Casing And Sealing Of Drilled Holes: Permanent
- § 816.22 Topsoil And Subsoil
- § 816.41 Hydrologic-balance Protection
- § 816.42 Hydrologic Balance: Water Quality Standards And Effluent Limitations
- § 816.43 Diversions
- § 816.45 Hydrologic Balance: Sediment Control Measures
- § 816.46 Hydrologic Balance: Siltation Structures
- § 816.47 Hydrologic Balance: Discharge Structures
- § 816.49 Impoundments
- § 816.56 Postmining Rehabilitation Of Sedimentation Ponds, Diversions, Impoundments, And Treatment Facilities
- § 816.57 Hydrologic Balance: Stream Buffer Zones
- § 816.59 Coal Recovery
- § 816.61 Use Of Explosives: General Requirements
- § 816.62 Use Of Explosives: Preblasting Survey
- § 816.64 Use Of Explosives: Blasting Schedule
- § 816.66 Use Of Explosives: Blasting Signs, Warnings, And Access Control
- § 816.67 Use Of Explosives: Control Of Adverse Effects
- § 816.68 Use Of Explosives: Records Of Blasting Operations
- § 816.71 Disposal Of Excess Spoil: General Requirements
- § 816.72 Disposal Of Excess Spoil: Valley Fills/head-of-hollow Fills
- § 816.73 Disposal Of Excess Spoil: Durable Rock Fills
- § 816.74 Disposal Of Excess Spoil: Preexisting Benches
- § 816.79 Protection Of Underground Mining
- § 816.81 Coal Mine Waste: General Requirements
- § 816.83 Coal Mine Waste: Refuse Piles
- § 816.84 Coal Mine Waste: Impounding Structures
- § 816.87 Coal Mine Waste: Burning And Burned Waste Utilization
- § 816.89 Disposal Of Noncoal Mine Wastes
- § 816.95 Stabilization Of Surface Areas
- § 816.97 Protection Of Fish, Wildlife, And Related Environmental Values
- § 816.99 Slides And Other Damage
- § 816.100 Contemporaneous Reclamation
- § 816.101 [reserved]
- § 816.102 Backfilling And Grading: General Requirements
- § 816.104 Backfilling And Grading: Thin Overburden
- § 816.105 Backfilling And Grading: Thick Overburden
- § 816.106 Backfilling And Grading: Previously Mined Areas
- § 816.107 Backfilling And Grading: Steep Slopes
- § 816.111 Revegetation: General Requirements
- § 816.113 Revegetation: Timing
- § 816.114 Revegetation: Mulching And Other Soil Stabilizing Practices
- § 816.116 Revegetation: Standards For Success
- § 816.131 Cessation Of Operations: Temporary
- § 816.132 Cessation Of Operations: Permanent
- § 816.133 Postmining Land Use
- § 816.150 Roads: General
- § 816.151 Primary Roads
- § 816.180 Utility Installations
- § 816.181 Support Facilities
- § 816.200 Interpretative Rules Related To General Performance Standards