Code of Federal Regulations · Section

§ 117.955 — Buffalo Bayou

33 C.F.R. § 117.955

View:

The draw of the Houston Belt and Terminal railroad bridge, mile 1.2 at Houston, and all drawbridges downstream of it, shall open on signal if at least 24 hours' notice if given.

Authorizing Statute