Code of Federal Regulations · Section
§ 154.1135 — Response Plan Development And Evaluation Criteria
33 C.F.R. § 154.1135
View:
The following response times must be used in determining the on scene arrival time in Prince William Sound for the response resources required by § 154.1045:
Authorizing Statute
-
Federal ozone measures42 U.S.C. § 7511b
-
Waterfront safety46 U.S.C. § 70011
-
Oil and hazardous substance liability33 U.S.C. § 1321