Code of Federal Regulations · Subpart
Subpart OOOOc — Emissions Guidelines For Greenhouse Gas Emissions From Existing Crude Oil And Natural Gas Facilities
40 C.F.R. pt. 60, subpt. OOOOc
- § 60.5360c c What Is The Purpose Of This Subpart?
- § 60.5361c c Which Pollutants Are Regulated By This Subpart?
- § 60.5362c c Am I Affected By This Subpart?
- § 60.5363c c What Must I Include In My State Or Tribal Plan?
- § 60.5364c c How Do I Apply To Use My State Standards As Part Of My State Or Tribal Plan Submission?
- § 60.5365c c How Do I Apply For A Less Stringent Standard Taking Into Consideration The Remaining Useful Life Of A Designated Facility And Other Factors?
- § 60.5366c c [reserved]
- § 60.5367c c Is There An Approval Process For My State Or Tribal Plan?
- § 60.5368c c What If My State Or Tribal Plan Is Not Approvable?
- § 60.5369c c Is There An Approval Process For A Negative Declaration Letter?
- § 60.5370c c What Compliance Schedule Must I Include In My State Or Tribal Plan?
- § 60.5371c c What Requirements Apply To Revisions To My State Or Tribal Plan?
- § 60.5372c c In Lieu Of A State Or Tribal Plan Submittal, Are There Other Acceptable Option(s) For A State To Meet Its Clean Air Act Section 111(d) Obligations?
- § 60.5373c c What Authorities Will Not Be Delegated To State, Local, Or Tribal Agencies?
- § 60.5374c c Does This Subpart Directly Affect Designated Facility Owners And Operators In My State?
- § 60.5375c c What Designated Facilities Must I Address In My State Or Tribal Plan?
- § 60.5376c c What Is The “model Rule” In This Subpart?
- § 60.5377c c How Does The Model Rule Relate To The Required Elements Of My State Or Tribal Plan?
- § 60.5378c c What Are The Principal Components Of The Model Rule?
- § 60.5379c c What Are My Requirements For Meeting Increments Of Progress And Achieving Final Compliance?
- § 60.5380c c What If I Do Not Meet The Final Control Plan Increment Of Progress Compliance Date?
- § 60.5381c c How Do I Comply With The Increment Of Progress For Submittal Of A Final Compliance Control Plan?
- § 60.5385c c What Is The Purpose Of This Subpart?
- § 60.5386c c Am I Subject To This Subpart?
- § 60.5387c c When Must I Comply With This Subpart?
- § 60.5388c c What Standards Apply To Super-emitter Events?
- § 60.5390c c What Ghg Standards Apply To Gas Well Liquids Unloading Operations At Well Designated Facilities?
- § 60.5391c c What Ghg Standards Apply To Associated Gas Wells At Well Designated Facilities?
- § 60.5392c c What Ghg Standards Apply To Centrifugal Compressor Designated Facilities?
- § 60.5393c c What Ghg Standards Apply To Reciprocating Compressor Designated Facilities?
- § 60.5394c c What Ghg Standards Apply To Process Controller Designated Facilities?
- § 60.5395c c What Ghg Standards Apply To Pump Designated Facilities?
- § 60.5396c c What Ghg Standards Apply To Storage Vessel Designated Facilities?
- § 60.5397c c What Ghg Standards Apply To Fugitive Emissions Components Designated Facilities?
- § 60.5398c c What Alternative Ghg Standards Apply To Fugitive Emissions Components Designated Facilities And What Inspection And Monitoring Requirements Apply To Covers And Closed Vent Systems When Using An Alternative Technology?
- § 60.5400c c What Ghg Standards Apply To Process Unit Equipment Designated Facilities?
- § 60.5401c c What Are The Alternative Ghg Standards For Process Unit Equipment Designated Facilities?
- § 60.5402c c What Are The Exceptions To The Ghg Standards For Process Unit Equipment Designated Facilities?
- § 60.5405c c What Test Methods And Procedures Must I Use For My Centrifugal Compressor And Reciprocating Compressor Designated Facilities?
- § 60.5406c c What Test Methods And Procedures Must I Use For My Process Unit Equipment Designated Facilities?
- § 60.5410c c How Do I Demonstrate Initial Compliance With The Standards For Each Of My Designated Facilities?
- § 60.5411c c What Additional Requirements Must I Meet To Determine Initial Compliance For My Covers And Closed Vent Systems?
- § 60.5412c c What Additional Requirements Must I Meet For Determining Initial Compliance Of My Control Devices?
- § 60.5413c c What Are The Performance Testing Procedures For Control Devices?
- § 60.5415c c How Do I Demonstrate Continuous Compliance With The Standards For Each Of My Designated Facilities?
- § 60.5416c c What Are The Initial And Continuous Cover And Closed Vent System Inspection And Monitoring Requirements?
- § 60.5417c c What Are The Continuous Monitoring Requirements For My Control Devices?
- § 60.5420c c What Are My Notification, Reporting, And Recordkeeping Requirements?
- § 60.5421c c What Are My Additional Recordkeeping Requirements For Process Unit Equipment Designated Facilities?
- § 60.5422c c What Are My Additional Reporting Requirements For Process Unit Equipment Designated Facilities?
- § 60.5424c c What Are My Additional Recordkeeping And Reporting Requirements If I Comply With The Alternative Ghg Standards For Fugitive Emissions Components Designated Facilities And Covers And Closed Vent Systems?
- § 60.5425c c What Parts Of The General Provisions Apply To Me?
- § 60.5430c c What Definitions Apply To This Subpart?
- § 60.5431c-60.5439c §§ 60.5431c-60.5439c [reserved]