Code of Federal Regulations · Section
§ 192.03 — Monitoring
40 C.F.R. § 192.03
View:
A groundwater monitoring plan shall be implemented, to be carried out over a period of time commencing upon completion of remedial actions taken to comply with the standards in § 192.02, and of a duration which is adequate to demonstrate that future performance of the system of disposal can reasonably be expected to be in accordance with the design requirements of § 192.02(c). This plan and the length of the monitoring period shall be modified to incorporate any corrective actions required under § 192.04 or § 192.12(c).
Authorizing Statute
-
Health and environmental standards for uranium mill tailings42 U.S.C. § 2022