Code of Federal Regulations · Section
§ 1065.395 — Inertial Pm Balance Verifications
40 C.F.R. § 1065.395
View:
This section describes how to verify the performance of an inertial PM balance.
(a) Independent verification. Have the balance manufacturer (or a representative approved by the balance manufacturer) verify the inertial balance performance within 370 days before testing.
(b) Other verifications. Perform other verifications using good engineering judgment and instrument manufacturer recommendations.
Authorizing Statute
No authorizing statute found.