Code of Federal Regulations · Part
Part 418 — Operating Criteria And Procedures For The Newlands Reclamation Project, Nevada
43 C.F.R. pt. 418
- § 418.1 Definitions
- § 418.2 How Project Water May Be Used
- § 418.3 Effect Of These Regulations On Water Rights
- § 418.4 Prohibited Deliveries
- § 418.5 Responsibility For Violations
- § 418.6 Fallon Paiute-shoshone Indian Reservation
- § 418.7 Who May Receive Irrigation Deliveries
- § 418.8 Types Of Eligible Land
- § 418.9 Reporting Changes In Eligible Land
- § 418.10 Determining The Amount Of Water Duty To Be Delivered
- § 418.11 Valid Headgate Deliveries
- § 418.12 Project Efficiency
- § 418.13 Maximum Allowable Limits
- § 418.14 Recordkeeping Requirements
- § 418.15 Operations Monitoring
- § 418.16 Using Water For Power Generation
- § 418.17 Truckee And Carson River Water Use
- § 418.18 Diversions At Derby Dam
- § 418.19 Diversions From The Truckee River To The Truckee Division
- § 418.20 Diversions From The Truckee River To Lahontan Reservoir, January Through June
- § 418.21 Diversion Of Truckee River Water To Lahontan Reservoir, July Through December
- § 418.22 Future Adjustments To Lahontan Reservoir Storage Targets
- § 418.23 Diversion Of Rock Dam Ditch Water
- § 418.24 Precautionary Drawdown And Spills From Lahontan Reservoir
- § 418.25 Water Use For Other Than Newlands Project Purposes
- § 418.26 Charges For Water Use
- § 418.27 Distribution System Operation
- § 418.28 Conditions Of Delivery
- § 418.29 Project Management
- § 418.30 Provisions Required In Future Contracts
- § 418.31 Conservation Measures
- § 418.32 Cooperative Programs
- § 418.33 Purpose Of The Implementation Strategy
- § 418.34 Valid Headgate Deliveries
- § 418.35 Efficiencies
- § 418.36 Incentives For Additional Long Term Conservation
- § 418.37 Disincentives For Lower Efficiency
- § 418.38 Maximum Allowable Diversion