§ 3276.13 — What Additional Information Must I Give Blm In The Monthly Report For Flash And Dry Steam Facilities?

43 C.F.R. § 3276.13

View:

In addition to the regular monthly report information required by § 3276.12, send to BLM:

(a) Steam flow into the turbine in klbs; for dual flash facilities, you must separate the steam flow into high pressure steam and low pressure steam;

(b) Condenser pressure in psia;

(c) Condenser temperature in deg. F;

(d) Auxiliary steam flow used for gas ejectors, steam seals, pumps, etc., in klbs;

(e) Flow of condensate out of the plant (after the cooling towers) in klbs; and

(f) Any other information we may require.