Code of Federal Regulations · Subpart
Subpart 162.060 — Ballast Water Management Systems
46 C.F.R. pt. 162, subpt. 162.060
- § 162.060-1 -1 Purpose And Scope
- § 162.060-10 -10 Approval Procedures
- § 162.060-12 -12 Use And Acceptance Of Existing Test Data
- § 162.060-14 -14 Information Requirements For The Ballast Water Management System (bwms) Application
- § 162.060-16 -16 Changes To An Approved Ballast Water Management System (bwms)
- § 162.060-18 -18 Suspension, Withdrawal, Or Termination Of Approval
- § 162.060-20 -20 Design And Construction Requirements
- § 162.060-22 -22 Marking Requirements
- § 162.060-24 -24 Test Plan Requirements
- § 162.060-26 -26 Land-based Testing Requirements
- § 162.060-28 -28 Shipboard Testing Requirements
- § 162.060-3 -3 Definitions
- § 162.060-30 -30 Testing Requirements For Ballast Water Management System (bwms) Components
- § 162.060-32 -32 Testing And Evaluation Requirements For Active Substances, Preparations, And Relevant Chemicals
- § 162.060-34 -34 Test Report Requirements
- § 162.060-36 -36 Quality Assurance Project Plan (qapp) Requirements
- § 162.060-38 -38 Operation, Maintenance, And Safety Manual (omsm)
- § 162.060-40 -40 Requirements For Independent Laboratories (ils)
- § 162.060-42 -42 Responsibilities For Independent Laboratories (ils)
- § 162.060-5 -5 Incorporation By Reference