Code of Federal Regulations · Subpart
Subpart L — Operations
49 C.F.R. pt. 192, subpt. L
- § 192.601 Scope
- § 192.603 General Provisions
- § 192.605 Procedural Manual For Operations, Maintenance, And Emergencies
- § 192.607 Verification Of Pipeline Material Properties And Attributes: Onshore Steel Transmission Pipelines
- § 192.609 Change In Class Location: Required Study
- § 192.610 Change In Class Location: Change In Valve Spacing
- § 192.611 Change In Class Location: Confirmation Or Revision Of Maximum Allowable Operating Pressure
- § 192.612 Underwater Inspection And Reburial Of Pipelines In The Gulf Of America And Its Inlets
- § 192.613 Continuing Surveillance
- § 192.614 Damage Prevention Program
- § 192.615 Emergency Plans
- § 192.616 Public Awareness
- § 192.617 Investigation Of Failures And Incidents
- § 192.619 Maximum Allowable Operating Pressure: Steel Or Plastic Pipelines
- § 192.620 Alternative Maximum Allowable Operating Pressure For Certain Steel Pipelines
- § 192.621 Maximum Allowable Operating Pressure: High-pressure Distribution Systems
- § 192.623 Maximum And Minimum Allowable Operating Pressure; Low-pressure Distribution Systems
- § 192.624 Maximum Allowable Operating Pressure Reconfirmation: Onshore Steel Transmission Pipelines
- § 192.625 Odorization Of Gas
- § 192.627 Tapping Pipelines Under Pressure
- § 192.629 Purging Of Pipelines
- § 192.631 Control Room Management
- § 192.632 Engineering Critical Assessment For Maximum Allowable Operating Pressure Reconfirmation: Onshore Steel Transmission Pipelines
- § 192.634 Transmission Lines: Onshore Valve Shut-off For Rupture Mitigation
- § 192.635 Notification Of Potential Rupture
- § 192.636 Transmission Lines: Response To A Rupture; Capabilities Of Rupture-mitigation Valves (rmvs) Or Alternative Equivalent Technologies