Code of Federal Regulations · Section
§ 193.2621 — Testing Transfer Hoses
49 C.F.R. § 193.2621
View:
Hoses used in LNG or flammable refrigerant transfer systems must be:
(a) Tested once each calendar year, but with intervals not exceeding 15 months, to the maximum pump pressure or relief valve setting; and
(b) Visually inspected for damage or defects before each use.
Authorizing Statute
-
General regulatory authority49 U.S.C. § 5103