Code of Federal Regulations · Section
§ 236.104 — Shunt Fouling Circuit
49 C.F.R. § 236.104
View:
Shunt fouling circuit shall be inspected and tested at least once every three months.
Authorizing Statute
-
Mode of recovery28 U.S.C. § 2461